Seal Coating and Fog Sealing

The city annually completes crack repair, seal coat and fog seal work on various local streets throughout the city as determined by the 10-Year Pavement Management Plan.

What to Expect During Seal Coat & Fog Seal Projects

The project will happen in several steps over a period of weeks:

  1. Crack Repair – Crews will start by cutting and filling cracks in the pavement to prevent water from getting underneath and causing more damage.

  2. Seal Coat Application – After the crack repairs, crews will return to apply a tack coat (a sticky layer) and then spread small rock chips (chip seal) on top. This helps protect the road and extend its life.

  3. Waiting Period – The chip rock layer needs to stay in place for at least 10 days. This allows it to set properly and ensures it sticks to the road surface.

  4. Fog Seal Application – After the waiting period, crews will come back one last time to apply a fog seal. This is a thin layer of asphalt-like material that seals everything in, reduces dust, and gives the road a smooth, black finish.

Parking and Traffic Reminders

  • “No Parking” signs will be placed on affected streets one day before work begins. These signs are a clear notice that work will start the next day.

  • Any vehicles still parked on the street when work begins will be towed at the owner's expense.

  • Streets will generally remain open to traffic, and residents will still have access to their driveways throughout most of the work.

  • You may notice loose rock and some dust during the process, but cleanup will occur as part of the final steps.

Thank you for your patience as we work to keep city streets safe and well-maintained.

Project Contact:
Nick Macklem, Project Coordinator
Phone: 763.592.6765
Email: [email protected] 