March 2020 update: All work is completed on the tower for this project. The driveway will be paved this spring. 

Photos of the pre-existing conditions and the on going construction can be seen in the slideshow. Keep in mind the water tower is filled with water to keep the water system pressurized, not to actually supply drinking water to the community! The city's water is pumped from a treatment facility in Minneapolis, NOT from the water tower basin shown in the photos. 
Work began on the tower in early September